Composite Geomembrane of Jiantong Used in Building Construction Project

23-10-2020

Composite Geomembrane of Jiantong Used in Building Construction Project  


The composite geomembrane has been used in the road construction project of our new client.

We also have the following suggestions for clients during construction:

Strengthen the protection and management of the finished product of composite geomembrane, increase the waterproofing awareness of relevant construction personnel, and put into normal operation as scheduled to ensure the quality of the project. 


It is recommended that the contractor notify and send a special person to supervise the construction personnel related to the waterproof material and find that the composite geomembrane must prevent oil from sticking, otherwise it will reduce the bonding strength. Storage and protection "see Introduction to geomembrane construction method".


After the composite geomembrane is welded into a finished product, a lake bottom mortar protective layer must be made first. The foundation is waterproof, and the reinforcement steel through-membrane welding method is used, and the protective layer of mortar is used to prevent hidden quality problems caused by electric welding.


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy